Please note, if an order within the Netherlands weighs more than 30 kilos, we’ll ship per pallet and we will charge different shipping costs, these costs will be calculated automatically in your shopping cart.
For pallet shipments abroad, please contact us for a customized quote via [email protected] or +31502053300.
With this entrance block it is possible to integrate the 1FTH and 2FTH directly into the masonry or the insulation. Due to the Main Cavity beneath the roost it is still possible to access all roost chambers. Thanks to the droppings chute, droppings usually dry before they fall out. Therefore, soiling of the façade is largely avoided. This Main Cavity is set under the 1FTH/2FTH for bricking in. To integrate the 1FTH/2FTH roost into the external thermal insulation composite system, it can also be fixed onto the wall using the fixing bracket and the Main Cavity is then placed on, or rather it is glued or bricked into, the insulation.
By installing the 1FTH/2FTH together with the Main Cavity, very inconspicuous solutions can be achieved, e.g. in building conservation structures or especially designed façades.
Material: SCHWEGLER lightweight concrete.
Outer dimension: Main Cavity only: approx. W 50 cm x H 36 cm x D 19.5 cm.
1FTH/2FTH with Main Cavity: approx. W 50 x H 90 x D 19.5 cm.
Weight: Main Cavity approx. 9 kg.
Colour: light grey.